• DECKING WITH

    DISABLED ACCESS

    Our client approached us wanting to replace a deck with ramp access. The previous deck was severely rotted due to a lack of airflow. We replaced the deck and left a small gap around to allow the air to flow underneath.

Build Time

2 WEEKS

In a short time the grass will grow to cover this small gap whilst allowing enough air to circulate preserving the timbers beneath. Bitumen paint was applied to all the timbers sitting on the existing base to protect against water damage and rot. A tight cut was achieved where the patio meets the deck despite it being irregular.

CONTACT US

For any inquiries please email

info@wildby.design